Connect Version History
Feature updateAction requiredVersion 2.6.92.0 was released on September 18, 2026, fixing a 2.6.91.0 issue that could prevent Pass-through Authentication setup through the Microsoft Entra Connect wizard.
Daily.Entra.NewsDaily AI-generated highlights from Microsoft Learn and Message Center. Browse the archive from 15 April 2025 → About this project →
ChatWork’s integration warning is the period’s main operational item: SCIM-based provisioning through the Microsoft Entra Enterprise App Gallery is slated to end on October 1, 2026. Other notable updates record an Entra Connect 2.6.92.0 fix for a Pass-through Authentication setup failure, staged hotfix rollout guidance, and expanded ID Governance guest-licensing coverage.
The provisioning guide warns that ChatWork will discontinue SCIM-based provisioning on October 1, 2026, retiring the Microsoft Entra Enterprise App Gallery integration. Existing customers will no longer be able to provision users through it after that date.
The version history records version 2.6.92.0 as released September 18, 2026, fixing a 2.6.91.0 issue that could prevent Pass-through Authentication setup through the Microsoft Entra Connect wizard. Administrators on 2.6.79.0 are told to uninstall it and install 2.6.92.0.
The updated version history states that auto-upgrade will move existing installations to the September 18, 2026 hotfix through multiple phases.
Administrators using app-scoped Conditional Access are told to review policies targeting Microsoft.Azure.SyncFabric or Microsoft 365 Reporting Service. The update also repositions the Microsoft Graph permissions notice.
The licensing table now covers guests disabled or deleted by lifecycle policies, sponsor attestations, and users sponsoring new guests. It also lists related beta API endpoints for attestation and sponsorship.
This period briefing was generated by AI from the tracked Microsoft Learn and Message Center changes.
Version 2.6.92.0 was released on September 18, 2026, fixing a 2.6.91.0 issue that could prevent Pass-through Authentication setup through the Microsoft Entra Connect wizard.
The version history no longer states that the 09/23/2026 hotfix will be deployed through phased auto-upgrade. The Microsoft Graph permissions notice was repositioned.
The version history now lists release 2.6.92.0 as September 23, 2026, and the related 2.6.91.0 support date as September 23, 2027. The page metadata date was also updated.
The version history now states that auto-upgrade will move existing installations to the September 18, 2026 hotfix through multiple phases.
The documentation warns that ChatWork will discontinue SCIM-based provisioning on October 1, 2026, retiring the Entra Enterprise App Gallery integration.
The licensing table now covers guests disabled or deleted by lifecycle policies, sponsor attestations, and users sponsoring new guests. It also lists the related beta API endpoints for attestation and sponsorship.